Plant 4 — Cedar Rapids
Extrusion & Assembly
Shift B · 14:00–22:00 · 3h 12m elapsed
Wed, Aug 19 · 17:12:04
6

Alerts

6 open
LIVE
JD
Production Planning & Tracking

Today's Production Overview

Extrusion — L1
1,284 u/hr
Running · 98% target
Molding — L2
946
Running · 91% target
Assembly — L3
612
Reduced speed · sensor drift
Packaging — L4
0
Down · changeover 8 min
Palletizing — L5
1,050
Running · 104% target

Line status timeline

last 12 hours · click a line to inspect
-12h-10h-8h-6h-4h-2hNOW
Running
Idle
Changeover
Maintenance
Emergency shutdown
Selected line Extrusion — L1 Running
Output today
9,840
OEE today
88%
Downtime today
12m
Current order
WO-48291

Throughput trend — last 8 hours

Time in state — today

OperatorR. Alvarez
ProductBracket Assembly 12mm
Last maintenanceAug 14
Units produced today
18,420 / 21,000
▲ 4.2% vs. plan pace
Schedule adherence
93.6%
▼ 1.1 pts vs. yesterday
Orders completed
11 / 17
— on pace
Active work orders
6
▲ 2 flagged at-risk

Planned vs. actual output — hourly

Shift B · Line 1–5 combined
Planned
Actual

Order status mix

On track (7)
At risk (3)
Behind (1)

Production schedule — Shift B

17 orders
OrderProductLinePlanned qtyActual qtyProgressDueStatus
WO-48291Bracket Assembly 12mmL13,2003,14098%18:00On track
WO-48292Housing Cover GreyL22,6002,19084%19:30On track
WO-48287Valve Body — StdL31,8001,12062%18:45At risk
WO-48295Connector Kit 8-pinL44,0001,86047%18:15Behind
WO-48280Sensor Mount AL52,2002,200100%16:20Complete
WO-48298Gasket Seal KitL21,50000%21:00Queued
Shift Analysis

Shift Performance Comparison

Shift A output (06–14)
22,140 units
▲ OEE 81.2%
Shift B output (14–22)
18,420 units, in progress
— OEE 76.4% so far
Shift C output (22–06)
19,860 units
▼ OEE 73.9%

Hourly output by shift — 7 day avg

units / hr
Shift A
Shift B
Shift C

Shift scorecard

ShiftOEEDowntimeTop issue
A · 06–1481.2%24 minMaterial staging delay
B · 14–2276.4%41 minSensor drift, L3
C · 22–0673.9%58 minOperator changeover
Shift C downtime trending up 3 weeks running — mostly tied to 22:00 handover gaps. Flagged for supervisor review.

Output intensity — last 12 hours

darker = higher throughput
06:0010:0014:0018:0022:00
Batch Tracking & Analysis

Batch Genealogy & Quality

Batch B-24817 — Bracket Assembly 12mm

Started 15:42 · Line 1 · Operator: R. Alvarez
QC hold
Mixing
Forming
Curing
QC check
Packaging
Complete
Dimensional variance flagged on 4 of 60 sampled units — within tolerance but trending toward upper limit. QC reviewing tooling wear on Die 3 before release.
Batches completed today
14
Avg batch yield
96.8%
In QC hold
2
Avg cycle time
3h 14m

Recent batches

last 24 hours
Batch IDProductLineStartYieldStatus
B-24817Bracket Assembly 12mmL115:42QC hold
B-24816Housing Cover GreyL214:1098.2%Complete
B-24815Valve Body — StdL313:0591.4%Complete
B-24814Sensor Mount AL511:5099.1%Complete
B-24813Connector Kit 8-pinL410:2288.7%Below target
B-24812Gasket Seal KitL209:1597.6%Complete
Line Efficiency & Productivity

Overall Equipment Effectiveness

Plant OEE — today

Availability × Performance × Quality
85% 79% TARGET 85% · UPDATED JUST NOW
91%
Availability
93%
Performance
94%
Quality

OEE by line

today

Line status timeline

last 12 hours · click a line to inspect
-12h-10h-8h-6h-4h-2hNOW
Running
Idle
Changeover
Maintenance
Emergency shutdown
Selected line Extrusion — L1 Running
Output today
9,840
OEE today
88%
Downtime today
12m
Current order
WO-48291

Throughput trend — last 8 hours

Time in state — today

OperatorR. Alvarez
ProductBracket Assembly 12mm
Last maintenanceAug 14

7-day productivity trend

units / labor hour
Yield, Downtime & Waste Management

Loss Analysis

Overall yield
94.7%
▲ 0.6 pts vs. yesterday
Scrap rate
2.9%
▲ 0.4 pts — watch Line 3
Downtime today
1h 47m
— in line with target

Downtime by cause — pareto

minutes, last 7 days
Downtime (minutes)
Cumulative % of total
Total downtime
1,336m
Top cause
Changeover · 30.8%
Top 3 causes =
68.9% of total

Waste breakdown

Material defect
Changeover scrap
Operator error
Other

Yield trend — 14 days

plant-wide
Reports, Alarms & Alerts

Operations Reporting Center

Active alarms

6 open
Line 4 packaging conveyor — motor overcurrent
CRITICAL · Asset PKG-CV-04 · 17:04 · 8 min open
Line 3 vision sensor — signal drift detected
WARNING · Asset ASM-VS-03 · 16:41 · 31 min open
Batch B-24817 — dimensional variance near tolerance
WARNING · QC · 16:58 · 14 min open
Line 2 scheduled maintenance window in 45 min
INFO · Asset MLD-EX-02 · Reminder
Shift B production pace 4.2% ahead of plan
INFO · Auto-generated · 17:00
Line 1 material hopper — low level, feed risk
CRITICAL · Asset EXT-HP-01 · 17:09 · 3 min open

Alarm volume — 7 days

Critical
Warning
Critical alarms down 22% week-over-week following L4 conveyor sensor recalibration.

Scheduled reports

CMMS + APM
Daily production summary
Auto-sent 06:00 & 22:00 · PDF + CSV
Shift handover report
Every shift change · auto-generated
Weekly OEE & downtime
Mondays 07:00 · sent to plant managers
Maintenance compliance
Monthly · CMMS work order closure rate

Open CMMS work orders

linked assets
P1
Replace conveyor motor — PKG-CV-04
Assigned: M. Chen · Due today
P1
Refill & inspect hopper — EXT-HP-01
Assigned: R. Alvarez · Due today
P2
Recalibrate vision sensor — ASM-VS-03
Assigned: T. Nguyen · Due tomorrow
P2
PM inspection — MLD-EX-02
Scheduled maintenance · in 45 min
P3
Lubricate bearings — Line 5 palletizer
Assigned: Unassigned · Due Fri
Asset & Maintenance Management

CMMS Workspace

Open work orders
7
▲ 2 high priority
Overdue PMs
1
PKG-CV-04 · 7 days overdue
Mean time to repair
2.4hrs
▼ 0.3 hrs vs. last month
Fleet uptime
96.2%
— on target

Work order queue

7 open
PriorityWork orderAssetAssignedStatusDue
P1Replace conveyor motorPKG-CV-04M. ChenIn progressToday
P1Refill & inspect hopperEXT-HP-01R. AlvarezOpenToday
P2Recalibrate vision sensorASM-VS-03T. NguyenOpenTomorrow
P2PM inspection — extruderMLD-EX-02K. OwusuScheduledIn 45m
P3Lubricate bearingsPLT-05UnassignedQueuedFri
P2Replace filter cartridgeEXT-HP-01R. AlvarezScheduledMon
P3Belt tension checkASM-VS-03T. NguyenCompletedYesterday

Asset health

5 assets
Material Hopper · EXT-HP-01
Line 1 · last PM Aug 14
82%
Molding Extruder · MLD-EX-02
Line 2 · last PM Aug 11
91%
Vision Sensor · ASM-VS-03
Line 3 · last PM Aug 6
64%
Packaging Conveyor · PKG-CV-04
Line 4 · last PM Jul 29
48%
Palletizer · PLT-05
Line 5 · last PM Aug 16
95%

Upcoming preventive maintenance

next 7 days
19
Aug · Today
PM inspection — Molding Extruder (MLD-EX-02)
Assigned: K. Owusu · starts in 45 min
Scheduled
20
Aug
Vision sensor recalibration — Assembly (ASM-VS-03)
Assigned: T. Nguyen
Scheduled
22
Aug
Belt & roller inspection — Palletizer (PLT-05)
Assigned: S. Patel
Scheduled
24
Aug
Hopper filter replacement — Extrusion (EXT-HP-01)
Assigned: R. Alvarez
Scheduled
12
Aug · overdue
Conveyor motor overhaul — Packaging (PKG-CV-04)
Assigned: M. Chen · 7 days overdue
Overdue