Production Planning & Tracking
Today's Production Overview
Extrusion — L1
1,284 u/hr
Running · 98% target
Molding — L2
946
Running · 91% target
Assembly — L3
612
Reduced speed · sensor drift
Packaging — L4
0
Down · changeover 8 min
Palletizing — L5
1,050
Running · 104% target
Line status timeline
last 12 hours · click a line to inspect-12h-10h-8h-6h-4h-2hNOW
Running
Idle
Changeover
Maintenance
Emergency shutdown
Selected line
Extrusion — L1
Running
Output today
9,840
OEE today
88%
Downtime today
12m
Current order
WO-48291
Throughput trend — last 8 hours
Time in state — today
OperatorR. Alvarez
ProductBracket Assembly 12mm
Last maintenanceAug 14
Units produced today
18,420 / 21,000
▲ 4.2% vs. plan pace
Schedule adherence
93.6%
▼ 1.1 pts vs. yesterday
Orders completed
11 / 17
— on pace
Active work orders
6
▲ 2 flagged at-risk
Planned vs. actual output — hourly
Shift B · Line 1–5 combinedPlanned
Actual
Order status mix
On track (7)
At risk (3)
Behind (1)
Production schedule — Shift B
17 orders| Order | Product | Line | Planned qty | Actual qty | Progress | Due | Status |
|---|---|---|---|---|---|---|---|
| WO-48291 | Bracket Assembly 12mm | L1 | 3,200 | 3,140 | 98% | 18:00 | On track |
| WO-48292 | Housing Cover Grey | L2 | 2,600 | 2,190 | 84% | 19:30 | On track |
| WO-48287 | Valve Body — Std | L3 | 1,800 | 1,120 | 62% | 18:45 | At risk |
| WO-48295 | Connector Kit 8-pin | L4 | 4,000 | 1,860 | 47% | 18:15 | Behind |
| WO-48280 | Sensor Mount A | L5 | 2,200 | 2,200 | 100% | 16:20 | Complete |
| WO-48298 | Gasket Seal Kit | L2 | 1,500 | 0 | 0% | 21:00 | Queued |
Shift Analysis
Shift Performance Comparison
Shift A output (06–14)
22,140 units
▲ OEE 81.2%
Shift B output (14–22)
18,420 units, in progress
— OEE 76.4% so far
Shift C output (22–06)
19,860 units
▼ OEE 73.9%
Hourly output by shift — 7 day avg
units / hrShift A
Shift B
Shift C
Shift scorecard
| Shift | OEE | Downtime | Top issue |
|---|---|---|---|
| A · 06–14 | 81.2% | 24 min | Material staging delay |
| B · 14–22 | 76.4% | 41 min | Sensor drift, L3 |
| C · 22–06 | 73.9% | 58 min | Operator changeover |
Shift C downtime trending up 3 weeks running — mostly tied to 22:00 handover gaps. Flagged for supervisor review.
Output intensity — last 12 hours
darker = higher throughput06:0010:0014:0018:0022:00
Batch Tracking & Analysis
Batch Genealogy & Quality
Batch B-24817 — Bracket Assembly 12mm
Mixing
Forming
Curing
QC check
Packaging
Complete
Dimensional variance flagged on 4 of 60 sampled units — within tolerance but trending toward upper limit. QC reviewing tooling wear on Die 3 before release.
Batches completed today
14
Avg batch yield
96.8%
In QC hold
2
Avg cycle time
3h 14m
Recent batches
last 24 hours| Batch ID | Product | Line | Start | Yield | Status |
|---|---|---|---|---|---|
| B-24817 | Bracket Assembly 12mm | L1 | 15:42 | — | QC hold |
| B-24816 | Housing Cover Grey | L2 | 14:10 | 98.2% | Complete |
| B-24815 | Valve Body — Std | L3 | 13:05 | 91.4% | Complete |
| B-24814 | Sensor Mount A | L5 | 11:50 | 99.1% | Complete |
| B-24813 | Connector Kit 8-pin | L4 | 10:22 | 88.7% | Below target |
| B-24812 | Gasket Seal Kit | L2 | 09:15 | 97.6% | Complete |
Line Efficiency & Productivity
Overall Equipment Effectiveness
Plant OEE — today
Availability × Performance × Quality91%
Availability
93%
Performance
94%
Quality
OEE by line
todayLine status timeline
last 12 hours · click a line to inspect-12h-10h-8h-6h-4h-2hNOW
Running
Idle
Changeover
Maintenance
Emergency shutdown
Selected line
Extrusion — L1
Running
Output today
9,840
OEE today
88%
Downtime today
12m
Current order
WO-48291
Throughput trend — last 8 hours
Time in state — today
OperatorR. Alvarez
ProductBracket Assembly 12mm
Last maintenanceAug 14
7-day productivity trend
units / labor hourYield, Downtime & Waste Management
Loss Analysis
Overall yield
94.7%
▲ 0.6 pts vs. yesterday
Scrap rate
2.9%
▲ 0.4 pts — watch Line 3
Downtime today
1h 47m
— in line with target
Downtime by cause — pareto
minutes, last 7 daysDowntime (minutes)
Cumulative % of total
Total downtime
1,336m
Top cause
Changeover · 30.8%
Top 3 causes =
68.9% of total
Waste breakdown
Material defect
Changeover scrap
Operator error
Other
Yield trend — 14 days
plant-wideReports, Alarms & Alerts
Operations Reporting Center
Active alarms
6 openLine 4 packaging conveyor — motor overcurrent
Line 3 vision sensor — signal drift detected
Batch B-24817 — dimensional variance near tolerance
Line 2 scheduled maintenance window in 45 min
Shift B production pace 4.2% ahead of plan
Line 1 material hopper — low level, feed risk
Alarm volume — 7 days
Critical
Warning
Critical alarms down 22% week-over-week following L4 conveyor sensor recalibration.
Scheduled reports
CMMS + APMDaily production summary
Shift handover report
Weekly OEE & downtime
Maintenance compliance
Open CMMS work orders
linked assetsP1
Replace conveyor motor — PKG-CV-04
P1
Refill & inspect hopper — EXT-HP-01
P2
Recalibrate vision sensor — ASM-VS-03
P2
PM inspection — MLD-EX-02
P3
Lubricate bearings — Line 5 palletizer
Asset & Maintenance Management
CMMS Workspace
Open work orders
7
▲ 2 high priority
Overdue PMs
1
PKG-CV-04 · 7 days overdue
Mean time to repair
2.4hrs
▼ 0.3 hrs vs. last month
Fleet uptime
96.2%
— on target
Work order queue
7 open| Priority | Work order | Asset | Assigned | Status | Due |
|---|---|---|---|---|---|
| P1 | Replace conveyor motor | PKG-CV-04 | M. Chen | In progress | Today |
| P1 | Refill & inspect hopper | EXT-HP-01 | R. Alvarez | Open | Today |
| P2 | Recalibrate vision sensor | ASM-VS-03 | T. Nguyen | Open | Tomorrow |
| P2 | PM inspection — extruder | MLD-EX-02 | K. Owusu | Scheduled | In 45m |
| P3 | Lubricate bearings | PLT-05 | Unassigned | Queued | Fri |
| P2 | Replace filter cartridge | EXT-HP-01 | R. Alvarez | Scheduled | Mon |
| P3 | Belt tension check | ASM-VS-03 | T. Nguyen | Completed | Yesterday |
Asset health
5 assetsMaterial Hopper · EXT-HP-01
82%
Molding Extruder · MLD-EX-02
91%
Vision Sensor · ASM-VS-03
64%
Packaging Conveyor · PKG-CV-04
48%
Palletizer · PLT-05
95%
Upcoming preventive maintenance
next 7 days19
Aug · Today
PM inspection — Molding Extruder (MLD-EX-02)
20
Aug
Vision sensor recalibration — Assembly (ASM-VS-03)
22
Aug
Belt & roller inspection — Palletizer (PLT-05)
24
Aug
Hopper filter replacement — Extrusion (EXT-HP-01)
12
Aug · overdue
Conveyor motor overhaul — Packaging (PKG-CV-04)